Chongqing Water Diversion Tunnel | 100 MPa Challenge
Chongqing Water Diversion Tunnel
UCS ≈ 100 MPa, massive hard rock with no visible joints
Category:
Tunneling Cutting Picks – Application Cases
Chongqing Water Diversion Tunnel
The tunnel passes through high-strength rock with no apparent fractures, featuring a uniaxial compressive strength (UCS) of up to 100 MPa and extremely high abrasiveness.
Under the original solution, excavation of 1 meter required dozens of cutting picks, resulting in extremely slow progress.

Customized Solution
Xinda’s technical team deployed the S135 Ultra-Wear-Resistant Cutting Picks specifically developed for hard and highly abrasive rock formations.
- Equipped with premium φ35mm carbide tips
- Incorporates patented materials and brazing technologies
- Optimized to achieve an ideal balance between hardness and toughness
- Designed for superior resistance to severe abrasive wear
The solution was applied directly on site for comparative testing.

Implementation Results
Wear Reduction:
In “grindstone” rock formations, after continuous excavation of 1.5 meters, only one cutting pick showed wear — a 95% reduction in pick consumption.
Efficiency Improvement:
Excavation efficiency increased by approximately 40%, significantly shortening the overall construction period.

Wear Condition of Xinda S135 Ultra-Wear-Resistant Cutting Pick After Operation