Solutions

Solutions

Our products are widely used in mining, metallurgy, expressways, railways, tunneling, metro systems, and water infrastructure projects.

Solutions and Construction Services

Shenzhen Metro Project | ~137 MPa Hard Rock

Shenzhen Metro Project

UCS ≈ 137 MPa, extremely hard rock

Tool life extended by 3×+, tunneling efficiency significantly improved

Guangxi Tunnel Project | F12 “Steel-Plate” Hard Rock Challenge

Guangxi Tunnel Project

UCS ≈ 120 MPa, steel-like hard rock

Tool consumption reduced by over 80%, project progress back on track

Chongqing Water Diversion Tunnel | 100 MPa Challenge

Chongqing Water Diversion Tunnel

UCS ≈ 100 MPa, massive hard rock with no visible joints

Dalian Bay Subsea Tunnel | Hard Rock & Shallow Cover

Dalian Bay Subsea Tunnel

UCS ≈ 100 MPa hard rock + 7 m shallow overburden

Construction period shortened by 35 days, tool wear significantly reduced

Shaanxi Alunite Mine Tunnel | Hard Rock Performance

Shaanxi Alunite mine tunnel

Hard rock, UCS ≈ 80 MPa

Pick consumption reduced by 87.5%, monthly advance increased by 50%

Xinjiang Fluorite Mine | Extreme Hard Rock

Xinjiang fluorite mine

Extremely hard rock, UCS ≈ 140 MPa

One pick consumed every 20 minutes; performance exceeded imported brands

Gansu Coal Mine | High-Efficiency Hard Rock

Gansu coal mine

Hard rock strata, UCS ≈ 120 MPa

Efficiency improved by 40%, stability surpassed imported products

Guizhou Coal Mine | Hard Rock, High Output

Guizhou coal mine

Hard rock, UCS ≈ 100 MPa

Efficiency increased by 40%, wear rate significantly reduced

Shenzhen Metro Line 16 | Shield Tunneling Project

Complex slightly weathered rock formations

High-toughness disc cutters with optimized structure

Full breakthrough without cutter replacement

Cutter change frequency significantly reduced

Guangzhou North River Water Diversion Project | HD418

Rock strength UCS 110–160 MPa

Disc cutter wear resistance improved by 30%+

No abnormal wear or cutter failure

Meets stringent TBM construction requirements

< 12 > proceed page